A series of emplacement tunnels will be constructed deep underground to house the HLW and SF canisters. An example layout for a SF/HLW repository and an operational study (surface facilities, emplacement tunnels, pilot tunnels, rock laboratory, access ramp, ventilation tower, etc.) has been developed by Nagra.

{flv width="550" height="340" usefullscreen="true" img="videos/HLW_overview_thumb.jpg"}Overview{/flv}

Video overview of a possible tunnel layout for a SF/HLW repository, designed for a sedimentary formation

The images below are stills taken from the Nagra Die LÖSUNG DVD which outlines the procedures and methods for the remote emplacement of a HLW / spent fuel canister.  Please see the Media & Downloads section for additional videos on geological emplacement.

A picture
Overview of Deep Geolgical Disposal - click for larger image

A picture
Emplacement tunnels - click for larger image

A picture
Pilot tunnels - click for larger image

A picture
Underground rock laboratory area - click for larger image

A picture
Access ramp - click for larger image

A picture
Repository situated at a depth ~600m - click for larger image