Grimsel Test Site
  • Home
  • GTS Information

    Information about the GTS

    • Grimsel Test Site Introduction
    • Technical Background to the Projects
    • Radiation Protection at the GTS
    • Search
    • Data Protection
    • Contact us
  • GTS Partners

    GTS Partners

    • GTS Partners Information
    • The Geology of the GTS
    • The Role of the GTS
    • 40 Years of History at the GTS
  • GTS Projects

    The GTS Projects

    • Overview of active GTS projectsOverview of active GTS projects
    • Archive of previous GTS projects (1997 to 2004)Archive of previous GTS projects (1997 to 2004)
    • CFM - Colloid Formation & MigrationCFM - Colloid Formation & Migration
    • C-FRS - CRIEPI’s Fractured Rock StudiesC-FRS - CRIEPI’s Fractured Rock Studies
    • CIM - Carbon-14 and Iodine-129 Migration in CementCIM - Carbon-14 and Iodine-129 Migration in Cement
    • ESDRED / TEM -Test and Evaluation of Monitoring SystemsESDRED / TEM -Test and Evaluation of Monitoring Systems
    • FEBEXe - Full-scale Engineered Barriers ExperimentFEBEXe - Full-scale Engineered Barriers Experiment
    • FEBEX-DP - Febex Dismantling ProjectFEBEX-DP - Febex Dismantling Project
    • FORGE - Laboratory Column ExperimentsFORGE - Laboratory Column Experiments
    • GAST - Gas-Permeable Seal TestGAST - Gas-Permeable Seal Test
    • HotBENT - High Temperature Effects on Bentonite BuffersHotBENT - High Temperature Effects on Bentonite Buffers
    • ISC - In-situ Stimulation & Circulation ExperimentISC - In-situ Stimulation & Circulation Experiment
    • LASMO - Large Scale MonitoringLASMO - Large Scale Monitoring
    • LCS - Long-Term Cement StudiesLCS - Long-Term Cement Studies
    • LTD - Long Term DiffusionLTD - Long Term Diffusion
    • MaCoTe The Material Corrosion TestMaCoTe The Material Corrosion Test
    • NF PRO - Near Field ProcessesNF PRO - Near Field Processes
    • PSG - Pore Space GeometryPSG - Pore Space Geometry
  • GTC Training Centre
  • Media

    Media & Downloads

    • GTS Newsletters
    • GTS / Nagra Blog
    • GTS Publications list
    • Grimsel Test Site Publications
    • Videos & Films Archive

GTS Phase VI

Grimsel Phase VI fomally began on 1st January 2003 and represents a major step forward in the research carried out at the GTS. The focus of the new research will be examining waste disposal concepts on more repository-relevant timescales and conditions. Three Phase V projects, FEBEX, HPF and GMT have been officially extended into 2005. This allows a greater volume of high quality data to be collected from these projects where long term monitoring is a fundemental part of the investigation.

Phase VI Experiments

CFM Experiment  FeBEXe experiment  FEBEX-DP Experiment  LCS Experiment

LTD experiment  NF-PRO experiment  PSG Experiment  TEM Experiment

C-FRS Experiment  FORGE Experiment GAST Experiment

Projects include:

  • Development and optimisation of the technology, transporting, emplacing, quality-assuring, monitoring and, if required, retrieving of radioactive waste.
     
  • Extending past studies of processes in the geosphere (mainly associated with radionuclide mobility) to more closely represent the physical scales (at least 10s of metres) and boundary conditions (e.g. low water velocities) relevant to repository environments. This requires multi-decade duration tests, more than an order of magnitude longer than has been the case in any rock laboratory anywhere in the world to date.
     
  • Monitoring and extending the knowledge and experience available from the present generation of radioactive waste experts by training the next generation who will actually build repositories.
     

There are no articles in this category. If subcategories display on this page, they may have articles.

Subcategories

Full-scale Engineered Barriers Expmnt. (FEBEX-DP) Article Count:  37

Gas-Permeable Seal Test (GAST) Article Count:  15

Laboratory Column Experiments (FORGE) Article Count:  8

CRIEPI’s Fractured Rock Studies (C-FRS) Article Count:  10

Pore Space Geometry (PSG) Article Count:  7

Full-scale Engineered Barriers Expmnt. (FEBEXE) Article Count:  7

Test and Evaluation of Monitoring Systems (TEM) Article Count:  9

Near Field Processes (NF-PRO) Article Count:  6

Long Term Diffusion (LTD) Article Count:  10

Long-Term Cement Studies (LCS) Article Count:  9

Colloid Formation and Migration (CFM) Article Count:  13

The Material Corrosion Test (MaCoTe) Article Count:  3

Large Scale Monitoring (LASMO) Article Count:  5

In-situ Stimulation and Circulation Experiment (ISC) Article Count:  1

High Temperature Effects on Bentonite Buffers (HotBENT) Article Count:  4

Carbon-14 and Iodine-129 Migration in Cement (CIM) Article Count:  4

The CFM Experiment

  • CFM Introduction
  • CFM Concept
  • CFM Project Aims
  • CFM Site Preparation [2009/10]
  • CFM Phase 1 [2004 - 2008]
  • CFM Phase 2 [2008 - 2013]
  • CFM In-situ Testing [2009/2011]
  • CFM In-situ Tracer Test [2012]
  • CFM : LIT (Long-term In situ Test) [2014]
  • CFM : IBET (In Rock Bentonite Erosion Test)
  • CFM References

40 years of Experience

Sample image 
40 Years experience

2014 marked a significant milestone in the history of the Grismel Test Site with the running of experiments which have spanned more than 30 years. Read more about the close to 40 years of scientific exploration in the 40 Years of History at the Gimsel Test Site section.

Grimsel 2010 - English (PDF 1,119 kb )

Grimsel 2010 - Deutsch  (PDF 989 kb )

CFM Video

GTS CFM PackerColloid Formation and Migration Video
A short video showing the tunnel packer installation.
  1. You are here:  
  2. Home
  3. GTS Projects
  4. CFM - Colloid Formation & Migration
  5. CFM In-situ Testing [2009/2011]
  6. GTS Phase VI
Copyright © 2025 Grimsel Test Site (Switzerland). All Rights Reserved.