Future work: Field testing proposed timetable

 

Test
Aims
End May
Reduction of outflow to 10 ml/min
Stability of flow system
Early July
Point Dilution 06.002ÞPinkel
Transport at low gradient
(Equipment check)
Option to change extraction flow rate if unstable flow system
August
Homologue 06.002ÞPinkel
Extend residence time-recovery
September
Point Dilution 06.001ÞPinkel
Pinkel capture zone
Autumn/ Winter 2010
CRR Repeat runs
Results from alternate dipole
Matrix diffusion test 06.002ÞPinkel
Solute transport at low gw velocity
Colloid+Rn Transport
06.002 Þ Pinkel
Characterise migration prior to in situ test
Spring/ Summer
2011
Preparations for in situ test
Monitoring boreholes: drilling and characterisation
Emplacement
 
Future work: Planned Lab testing

 

KAERI
JAEA
CRIEPI
RN-colloids interaction
(a) (d)
- Sorption kinetics and reversibility of Np(IV,V), Am(III) in SGW/KoB coll (Batch)
- Generation of Am(III), Np(IV) coll (Batch)
- Distribution of Np(IV), Tc(IV) in SGW/KuF coll/granite (Batch)
- Generation of Am(III), Np(IV) coll (Dialysis)
- Reversibility of Am(III), Np(IV) in SGW/KuF coll/granite (Dialysis)
Column transport
(a) (d)
- Transport of Np(V), Am(III) with KoB coll in natural fracture of KURT granite core

 

 

Colloid generation
(b) (d)
- Colloid generation from KoB in KURT granite (in-situ)
- Colloid generation from KV1, FBX(BENTFLOW)

 

Bentonite extrusion
(b) (d)

 

- Extrusion of KV1 into acrylic fracture (BENTFLOW)