Emplacement of the Heater element into the Febex drift :
![]() |
![]() |
|
View toward the FEBEX tunnel during emplacement phase. In the foreground is the insertion car and in the background the backfilled tunnel is visible. The tunnel diameter is 2.28 m. | Loading of the electrical heater (weight 12 t, length 4.5 m) onto the insertion car. | |
![]() |
Heater insertion operation. Note the numerous cables for the monitoring system on both sides and along the top line of the tunnel. |
Full-scale High Level Waste Engineered Barriers (FEBEX) - In-Situ Testing