NAB
|
Title
|
Author(s)
|
16-009
|
pdf
NAB 16 009 Results of laboratory investigations in preparation of the dismantling of the FEB
(26.59 MB)
|
Siñeriz et al.
|
16-010
|
pdf
NAB 16 010 FEBEX DP – Plug Overcoring and Concrete Bentonite Interface Sampling prior to Dismantling
(25.82 MB)
|
Mäder et al.
|
16-011
|
pdf
NAB 16 011 FEBEX DP Dismantling of heater 2
(37.92 MB)
|
Siñeriz et al.
|
16-012
|
pdf
NAB 16 012 FEBEX DP on site analyses report
(15.63 MB)
|
Villar et al.
|
16-013
|
pdf
NAB 16 013 Gas and water sampling from the FEBEX in situ test
(26.45 MB)
|
Fernandez et al.
|
16-014
|
pdf
NAB 16 014 Hydrogeochemical characterisation of the groundwater in the FEBEX gallery
(8.05 MB)
|
Garralon et al.
|
16-015
|
pdf
NAB 16 015 FEBEX DP Microbiological report
(5.77 MB)
|
Bengtsson et al.
|
16-016
|
pdf
NAB 16 016 Metal Corrosion and Iron Bentonite Interaction Studies
(49.15 MB)
|
Wersin et al.
|
16-017
|
pdf
NAB 16 017 FEBEX DP Post mortem THM THG Analysis Report Rev 1
(13.45 MB)
|
Villar et al.
|
16-018
|
pdf
NAB 16 018 FEBEX DP Concrete ageing, concrete bentonite and concrete rock interaction analysis
(46.10 MB)
|
Turrero et al.
|
16-019
|
pdf
NAB 16 019 FEBEXe Final Sensor Data Report (FEBEX in situ Experiment)
(10.08 MB)
|
Martiñez et al.
|
16-020
|
pdf
NAB 16 020 FEBEX DP Post mortem analysis Sensors
(7.32 MB)
|
Rey et al.
|
16-021
|
pdf
NAB 16 021 FEBEX DP Bentonite TDR probe inspection and data verification report
(16.55 MB)
|
Sakaki et al.
|
16-022
|
pdf
NAB 16 022 Pre dismantling THM modelling of the FEBEX in situ experiment
(6.38 MB)
|
Papafotiou et al.
|
16-023
|
pdf
NAB 16 023 FEBEX DP Pre dismantling THC Modelling
(15.86 MB)
|
Birgersson et al.
|
16-024
|
pdf
NAB 16 024 Thermo hydro mechanical Postmortem Analysis of bentonite performed at CIEMAT
(35.74 MB)
|
Villar et al.
|
16-025
|
pdf
NAB 16 025 Thermo hydro chemical (THC) behaviour of a Spanish bentonite after dismantling
(236.65 MB)
|
Fernandez et al.
|
16-054
|
pdf
NAB 16 054 Corrosion Study of FEBEX DP Components
(22.22 MB)
|
Madina
|
16-068
|
pdf
NAB 16 068 FEBEX DP – Dismantling related supplementary documents
(81.49 MB)
|
Kober & van Meir
|
NTB
|
Title
|
Main Author
|
15-04
|
pdf
NTB 15 04 Grimsel Test Site Investigation Phase VI Main outcomes and review of the FEBEX
(11.25 MB)
|
Lanyon & Gaus
|
17-01
|
pdf
FEBEX-DP Dismantling Synthesis Report
(845.98 MB)
|
Kober et al.
|